15 kW Solar + 20 kWh BESS: Full DG Replacement
15 kW Solar · 20 kWh LFP · DG Replaced
20 kWh
Battery Installed
~80%
Bill Reduced
Removed
DG Status
3.5 yr
Payback

Projects
Case studies from our installations across India. Real numbers, real projects.
25+
Energy System Projects
1.5 MW+
Capacity Deployed
6000 T
CO₂ Avoided / Year
12+
Cities Covered
20 Years
of Experience
100 EPC
Electrical Projects (Indexel)
15 kW Solar · 20 kWh LFP · DG Replaced
20 kWh
Battery Installed
~80%
Bill Reduced
Removed
DG Status
3.5 yr
Payback
16 kWh LFP · DG Replaced · Bungalow
16 kWh
Battery Installed
Removed
DG Status
<20ms
Switchover Time
4 yr
Payback
10 kWh LFP · VRLA Replaced · Apartment
10 kWh
Battery Installed
4×
Battery Life vs VRLA
90%
Usable DoD vs 50% VRLA
3.5 yr
Payback
10 kWh LFP · VRLA Replaced · Villa
10 kWh
Battery Installed
4×
Cycle Life vs VRLA
Zero
Replacements Since Install
3.5 yr
Payback
100 kWh Total · 20 Sites · VRLA + DG Replaced
20
Sites Commissioned
20
DGs Silenced
1 day
Commission Per Site
4 yr
Avg Payback
62 kWh LFP · Warehouse · DG Replaced
62 kWh
Battery Installed
Removed
DG Status
Zero
Exhaust in Loading Bay
3.5 yr
Payback
32 kWh LFP · Office · DG Replaced
32 kWh
Battery Installed
Removed
DG Status
<20ms
Switchover vs 45 Sec DG
3.5 yr
Payback
100 kW Solar · 64 kWh LFP · DG Replaced
100 kW
Solar Installed
~80%
Grid Draw Reduced
0
Exam Disruptions Since Install
4 yr
Payback
94.2 kWh LFP · Resort · DG Replaced
94.2 kWh
Battery Installed
Removed
DG Status
0
Noise Complaints Since Install
4 yr
Payback
125 kW / 756 kWh · 10 ft Mobile · DG Replaced
756 kWh
Battery Capacity
0 dB
Generator Noise
6–8 hrs
Runtime Per Charge
3.5 yr
Payback
35 kW Solar · 64 kWh LFP · DG Replaced
35 kW
Solar Installed
Removed
DG Status
~55%
Electricity Cost Cut
4 yr
Payback
50 kW Solar · 64 kWh LFP · DG Replaced
50 kW
Solar Installed
Removed
DG Status
~60%
Electricity Cost Cut
4 yr
Payback
120 kWh Total · 100 Vessels · Marine LFP
100
Vessels Electrified
Silent
Fleet Operations
Zero
Diesel in Water
3.5 yr
Payback
2.5 kWh/Boat · City Park · Zero Emissions
Silent
All Boat Operations
Zero
Fuel in Lake
~80%
Operating Cost Cut
3.5 yr
Payback
50 kW Solar · 64 kWh LFP · DG Replaced
50 kW
Solar Installed
Removed
DG Status
~60%
Electricity Cost Cut
4 yr
Payback
By the Numbers
12+ Cities
Projects delivered across Rajasthan, Karnataka, Maharashtra, Telangana, and Haryana.
25+ Projects
From 2.5 kWh park boats to 756 kWh concert venues. Residential to industrial. No project too small or too large.
3.5–4 yr
3.5 to 4 year payback across every project. 1,200 to 2,000 litres of diesel eliminated per month per site.
Ready to start?
We will size the right system and send you a proposal within 48 hours.